Mechanical Characteristics and Optimum Design of an SMW Construction Method for a Comprehensive Pipe Gallery in a Water-rich Weak Stratum |
MIAO Xiang-da1,2, ZHANG Min2, WANG Yan-ming1, LIANG Bin2 |
1. CCCC-SHEC Forth Engineering Co. Ltd., Luoyang Henan 471013, China; 2. School of Civil Engineering, Henan University of Science and Technology, Luoyang Henan 471023, China |
|
|
Abstract The K0+080-K0+275 bid section of the underground comprehensive pipe corridor on Wanxin Road in Binhai New City located in Fuzhou was considered in this work. The mechanical properties and optimal design of the soil mixing wall (SMW) construction method piles (steel-cement mixing piles) in the comprehensive pipe corridor in the water-rich, weak stratum were studied. In the K0+080-K0+275 bid section of the comprehensive pipe gallery, different construction parameters of the steel-cement-soil mixing piles were tested through pile tests. The construction parameters of the SMW construction piles were as follows:water-cement ratio of 1.3 and cement content of 20%. The finite element software MIDAS-GTS NX was used to establish a mechanical model of the SMW construction method piles. The variations in mechanical characteristics, such as the horizontal displacement of SMW construction method piles under different supporting pile diameters, steel layouts, steel sizes, and supporting axial forces, were analyzed. The optimal design of the SMW construction method piles was also determined. Results revealed that when the pile diameter of the SMW construction method increased from 0.55 m to 0.85 m, the horizontal displacement of the pile body decreased by 28.9%. The horizontal displacement of the pile body could be effectively controlled by increasing the pile diameter. Increasing the size of the flange and web of the section steel had little effect on the deformation of the foundation pit. The flange was sensitive to the deformation of the supporting structure because it was on the stressed side. The different layout forms of the steel section exerted a great influence on the deformation of the foundation pit. The maximum horizontal displacement of the pile body for the type of steel close insertion was 18.4% less than that for the plug-one-jump-one insertion type. Increasing the supporting pre-added axial force effectively reduced the deformation of the envelope structure, and adopting the value of 50%-80% of the designed axial force was reasonable. The K0+080-K0+275 bid section of the Wanxin Road underground comprehensive corridor was determined to be supported by φ650@450 cement-soil five-axis mixing pile interpolated with HM500×300×11×18 section steel, and the layout of the section steel adopts the plug-one-hop-one type. The on-site monitoring data of the optimal construction plan were in accordance with the change law of the numerical simulation and were successfully used in the underground comprehensive pipe corridor project. Ideal results were achieved.
|
Received: 05 July 2020
|
Fund:Supported by the National Natural Science Foundation(No. 11402077), Key Scientific Research Projects of the Second Bureau of China Communications(No.2018-3-42), Henan University of Science and Technology Industry-University-Research Cooperation Project(No.2015HNCXY011) |
Corresponding Authors:
MIAO Xiang-da
E-mail: 1009759817@qq.com
|
|
|
|
[1] LAI Hao-ran, HUANG Chang-yuan, LIU Xue-zeng, et al. Analysis on the Effects of Overloading on the Mechanical Properties of Tunnel Structures in the Silty Ground:A Case Study of Sutong River-crossing GIL Utility Tunnel[J]. Modern Tunnel Technology, 2018, 55(5):88-96. (in Chinese) [2] DONG Na, ZHANG Meng. Comprehensive Post-Evaluation System for Utility Tunnel PPP Projects[J]. Journal of Huaqiao University:Natural Science Edition, 2019,40(4):494-502. (in Chinese) [3] GAO Zheng. Consideration on the Construction of Urban Utility Tunnel in Xiamen City[J]. China Water & Wastewater, 2017, 33(24):36-39. (in Chinese) [4] LIU Cheng-dong, LI Shu, TANG Hong-hui, et al. Similarity Analysis on the Ventilating Reduced-scale Model of Urban Underground Utility Tunnel[J]. Chinese Journal of Underground Space and Engineering, 2019,15(6):1609-1619. (in Chinese) [5] YANG Jian-hua. On Application of SMW Method in Foundation Pit Supporting Structure under Complex Condition[J]. Journal of Southwest China Normal University:Natural Science Edition, 2017, 42(7):132-137. (in Chinese) [6] ZHENG Li-zhi.The Application of SMW Pile in Spring Area Silty Clay Stratum with Strong Water Gushing[J]. Architecture Technology, 2019,50(11):1389-1391. (in Chinese) [7] WANG Rui-qing. Deep Foundation Pit Support Technique for Pipe Gallery on Muddy Ground[J]. Architecture Technology, 2019, 50(1):85-87. (in Chinese) [8] LI Ai-di, LI Cheng-xun, DONG Ying. Research on Construction Techniques for an SMW Retaining Structure for a Deep Foundation Pit in Soft Muddy Soil[J]. Modern Tunnelling Technology, 2014,51(5):180-185. (in Chinese) [9] ZHAO Jing. Technology for Construction of Baijiahu Station in Nanjing Metro with SMW Construction Work Piles[J]. Railway Standard Design, 2010(S1):132-137. (in Chinese) [10] SUN Shu-wei, ZHU Ben-zhen, MA Ning. Analysis of Excavation Method and Design Parameters for Underground Pipeline Utility Tunnel[J]. Journal of the China Railway Society, 2019, 36(3):61-66. (in Chinese) [11] ZHAO Chun-feng, ZOU Yu-wan, ZHAO Cheng, et al. Experimental Research on Strength of Five-axis Cement-soil Mixed Piles[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(2):376-381. (in Chinese) [12] LIANG Zhi-rong, LI Zhong-cheng, LIU Jiang, et al. Strength Analysis and Experimental Research on Soil-cement Mixed Pile Made by Triaxial Stirring Machine[J] Journal of Underground Space and Engineering, 2009,5(S2):1562-1567. (in Chinese) [13] JU Juan, YE Yao-dong, WANG Ru-lu. Test Study of Impacts of SMW Constructed Pile on Horizontal Displacement of DEEP Soil[J]. Building Technology, 2006, 37(12):903-905. (in Chinese) [14] WANG Guo-biao, TAO Wen-hui, YANG Hong-li, et al. Optimal Design of Shoring Pile on Deep Foundation Pit Based on Fem Numerical Simulation[J]. Northwest Hydroelectric Power, 2006, 22(2):37-40. (in Chinese) [15] LI Dong-hai, WANG Meng-shu, DING Zhen-ming, et al. Three-dimensional Numerical Analysis and Monitoring of Deformation of SMW Retaining Structures of Deep Excavations in Gravelly Soils[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(S1):120-124. (in Chinese) [16] LOU Chun-hui, XIA Tang-dai, LIU Nian-wu. Deformation Characteristics of SMW Piles in Excavation on Soft Clay[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(S2):1208-1211. (in Chinese) [17] AN Ning. Study on Application of SMW Construction Method in Deep Foundation Pit Support of Xiangyi Apartment Project[D]. Guilin:Guilin University of Technology, 2014. (in Chinese) [18] JIA Di, SHI Feng, ZHENG Gang, et al. Discussion on Value of Soil Elastic Modulus in Numerical Simulation of Deep Foundation Pit Engineering[C]//Proceedings of the Fifth National Foundation Pit Engineering Symposium. Tianjin:Chinese Architectural Society, 2008:155-158. (in Chinese) [19] LI Jun, ZHOU Shi-chong, WANG Lei, et al. Method of Determining Elastic Modulus in Numerical Analysis of Soft Soil Area[J]. China Water Transport:2nd Half Month, 2017,17(5):324-325,328. (in Chinese) [20] ZHOU Mei-yan. Performance Analysis and Support Optimization Design of SMW Construction Method[D]. Qingdao:China University of Petroleum (East China), 2008. (in Chinese) |
|
|
|