|
|
Study on Double Deck and Four-cable Stayed Bridge with Univalent Hyperboloid Column Tower |
ZHU Jin-kun1, SHA Zhen-fang2 |
1. Nanjing Architectural Design and Research Institute Co., Ltd., Nanjing Jiangsu 210007, China; 2. Zhangjiagang Free Trade Zone Jingang Construction Engineering Quality Inspection Co., Ltd., Suzhou Jiangsu 215633, China |
|
|
Abstract Aiming at the city wide deck cable-stayed bridge, a double separated deck and four-cable-stayed bridge with univalent hyperboloid single column bridge tower was proposed.The bridge deck with double separated steel box girder replaces the bridge deck wide steel box girder, the univalent hyperboloid single column bridge tower replaces the double column bridge tower, and the four-cable-stayed bridge replaces the double cable-stayed bridge.The univalent hyperboloid single column tower bridge has a thick bottom, which can ensure the bearing capacity of the single column tower structure; the waist of the bridge tower is small and the driver's vision is wide; the wider top of the bridge tower can facilitate the scattered anchoring of stay cables.Combined with the 200 m+420 m+200 m double separated deck and four-cable-stayed bridge with the univalent hyperboloid single column tower, the engineering parameters are designed, the Midas finite element analysis model is established, the static analysis and dynamic modal analysis are carried out, and the structural rationality of double separated deck and four-cable stayed bridge with the univalent hyperboloid single column tower is verified.
|
Received: 31 October 2021
|
|
|
|
[1] ZHANG Xi-gang, WANG Ren-gui, LIN Dao-jin, et al. Innovative Structural System Design of Multi Tower Cable Stayed Bridge of Jiashao Bridge[J]. Highway, 2013(7):286-289. (in Chinese) [2] Yuan Peng, Li Dejian, Li Chuanxi, Luo Chaoyun. Study of Spatial Force Conditions of Steel Box Girder Cable-Stayed Bridge with Four Cable Planes Under Reasonable Completed Bridge State[J]. Bridge Construction, 2016, 46(1):47-52. (in Chinese) [3] YUAN P, CAI C S, LI D, et al. A Novel Method for Determining the Spatial Responses of a Cable-stayed Bridge with Four-cable-planes[J]. Engineering Structures, 2019, 180:223-233. [4] WANG Lin. Analysis of Beam Structure and Calculation of Wide Span and Long-span Concrete Cable-stayed bridge[J]. Engineering and Construction, 2020, 34(3):429-431. (in Chinese) [5] WANG P-H, TANG T-Y, ZHENG H-N. Analysis of Cable-Stayed Bridges during Construction by Cantilever Methods[J]. Computers and Structures, 2004, 82(4):329-346. [6] MARTINS A M B, SIMÕES L M C, NEGRÃO J H J O. Optimization of Concrete Cable-stayed Bridges under Seismic Action[J]. Computers and Structures, 2019, 222:36-47. [7] ZHANG Qiu-xin, TU Lin-wei, YAN Guo-qi. Analysis of Influence of Construction Control Parameters for Two-Pylon Cable-Stayed Bridge with Four Cable Planes and Combined Dual Decks[J]. World Bridges, 2015, 43(6):73-78. (in Chinese) [8] HU Zheng-rong, WANG Yue-wu. Analysis on Construction Control Technology of Single Tower Four Cable Plane Space Special Shaped Cable Stayed Bridge[J]. Journal of China & Foreign Highway, 2015, 35(1):155-160. (in Chinese) |
|
|
|